Chief Joseph

HydroelectricWashingtonFirst unit online 1955

Chief Joseph is a hydroelectric plant in Douglas County, Washington, operated by USACE Northwestern Division. Among the 1,390 hydroelectric plants in the country it is the second-largest. By nameplate capacity it is the 31st-largest power plant in the United States and the second-largest in Washington. Within the Bonneville Power Administration balancing area it is the second-largest of 129 plants.

Nameplate capacity, 2025

2,456 MW

2,456 MW net summer capacity

27 operable units

  • Hydro2,456 MW100%

Unit by unit, 1955 to 2025

operating in 2025bar height follows unit size

4 units Hydro, 353 MW, 1955
3 units Hydro, 265 MW, 1956
5 units Hydro, 441 MW, 1957
4 units Hydro, 353 MW, 1958
3 units Hydro, 285 MW, 1977
4 units Hydro, 380 MW, 1978
4 units Hydro, 380 MW, 1979

Among Washington’s plants

Largest plants in the state by nameplate capacity, with the plants ranked next to this one.

  1. 1Grand Coulee6,809 MW
  2. 2Chief Josephthis plant
  3. 3Rocky Reach1,349 MW
  4. 4Wanapum1,220 MW

All power plants in Washington

Other rankings

Hydroelectric plants in Washington
2nd of 72
Plants run by USACE Northwestern Division
1st of 21
Biggest single unit, among Washington’s plants
41st of 138

Operable units

UnitTechnologyNameplateSummerOnlineStatus
10Hydro88.2 MW88.2 MW1955Out of service, expected back
11Hydro88.2 MW88.2 MW1955Out of service, expected back
12Hydro88.2 MW88.2 MW1955Out of service, expected back
9Hydro88.2 MW88.2 MW1955Out of service, expected back
8Hydro88.2 MW88.2 MW1956Out of service
7Hydro88.2 MW88.2 MW1956Out of service
6Hydro88.2 MW88.2 MW1956Operating
13Hydro88.2 MW88.2 MW1957Out of service, expected back
5Hydro88.2 MW88.2 MW1957Operating
14Hydro88.2 MW88.2 MW1957Operating
15Hydro88.2 MW88.2 MW1957Operating
16Hydro88.2 MW88.2 MW1957Operating
4Hydro88.2 MW88.2 MW1958Operating
3Hydro88.2 MW88.2 MW1958Operating
2Hydro88.2 MW88.2 MW1958Operating
1Hydro88.2 MW88.2 MW1958Operating
17Hydro95 MW95 MW1977Operating
18Hydro95 MW95 MW1977Operating
19Hydro95 MW95 MW1977Out of service, expected back
20Hydro95 MW95 MW1978Operating
21Hydro95 MW95 MW1978Operating
22Hydro95 MW95 MW1978Operating
23Hydro95 MW95 MW1978Operating
24Hydro95 MW95 MW1979Operating
25Hydro95 MW95 MW1979Operating
26Hydro95 MW95 MW1979Operating
27Hydro95 MW95 MW1979Operating

Grid and site

Reliability region
Western Electricity Coordinating Council
Highest grid connection voltage
500 kV
Water source
Columbia River
Nearest town on record
Bridgeport
Operator type
Utility
Coordinates
47.995°N, 119.640°W

Closest plants

PlantRuns onCapacityDistance
WellsHydroelectric867 MW10.9 mi west
ChelanHydroelectric59.2 MW20.5 mi southwest
Main Canal HeadworksHydroelectric26.8 MW30.6 mi southeast
Grand CouleeHydroelectric6,809 MW30.8 mi east
Summer Falls Power PlantHydroelectric92 MW37.7 mi southeast
Rocky ReachHydroelectric1,349 MW44.1 mi southwest
Rock IslandHydroelectric629 MW49.5 mi southwest
Wild HorseWind273 MW71.3 mi south