GridPlants

El Centro Hybrid

Natural gasCalifornia

El Centro Hybrid is a natural gas plant in Imperial County, California, operated by Imperial Irrigation District. Within the Imperial Irrigation District balancing area it is the largest of 58 plants. A further 113 MW of new generating units is reported as planned or under construction on the site. Its oldest working unit dates from 1952, the second-earliest start among California’s 303 natural gas plants. Two units here can switch between natural gas and oil.

Nameplate capacity, 2025

388 MW

323 MW net summer capacity

7 operable units

  • Gas combined cycle277 MW71%
  • Gas steam turbine81.6 MW21%
  • Battery30 MW7.7%

Unit by unit, 1952 to 2025

operating in 2025retiredreported planned retirementbar height follows unit size

Unit 2 Gas combined cycle, 34.5 MW, 1952
Unit 3 Gas steam turbine, 50 MW, 1957–2010
Unit 4 Gas steam turbine, 81.6 MW, 1968
Unit 2A Gas combined cycle, 89.9 MW, 1993
Unit 30 Gas combined cycle, 65.9 MW, 2012
Unit 31 Gas combined cycle, 43.2 MW, 2012
Unit 32 Gas combined cycle, 43.2 MW, 2012
Unit BESS Battery, 30 MW, 2016

Among California’s plants

Largest plants in the state by nameplate capacity, with the plants ranked next to this one.

  1. 1Diablo Canyon2,323 MW
  2. 2Dynegy Moss Landing Power Plant Hybrid1,848 MW
  3. 3Haynes1,739 MW
  4. 53Arica Solar399 MW
  5. 54Pio Pico Energy Center395 MW
  6. 55El Centro Hybridthis plant
  7. 56Magnolia Power Project388 MW
  8. 57Oberon II Solar Project375 MW

All power plants in California

Other rankings

All US power plants
866th of 14,286
Power plants in California
55th of 1,870
US natural gas plants
527th of 1,961
Natural gas plants in California
35th of 303
Plants run by Imperial Irrigation District
1st of 13
Biggest single unit, among California’s plants
211th of 1,870

Operable units

UnitTechnologyNameplateSummerOnlineStatus
2Gas combined cycle34.5 MW32.5 MW1952Operating
4Gas steam turbine81.6 MW67.6 MW1968Operating, retirement planned for 2029
2AGas combined cycle89.9 MW73 MW1993Operating
30Gas combined cycle65.9 MW42 MW2012Operating
31Gas combined cycle43.2 MW39 MW2012Operating
32Gas combined cycle43.2 MW39 MW2012Operating
BESSBattery30 MW30 MW2016Operating

Retired units

Retired capacity here totals 50 MW, mostly natural gas units.

UnitTechnologyNameplateIn service
3Gas steam turbine50 MW1957–2010

New units reported to EIA

TechnologyNameplateExpectedStage at end of 2025
Gas engine18.8 MW2029planned, approvals not yet sought
Gas engine18.8 MW2029planned, approvals not yet sought
Gas engine18.8 MW2029planned, approvals not yet sought
Gas engine18.8 MW2029planned, approvals not yet sought
Gas engine18.8 MW2029planned, approvals not yet sought
Gas engine18.8 MW2029planned, approvals not yet sought

Grid and site

Reliability region
Western Electricity Coordinating Council
Highest grid connection voltage
92 kV
Water source
Dogwood Canal
Nearest town on record
El Centro
Operator type
Utility
Coordinates
32.802°N, 115.540°W

Closest plants

PlantRuns onCapacityDistance
Sol Orchard El Centro PVSolar20 MW0.4 mi west
IVC SolarSolar3 MW2.8 mi northeast
Valencia 3Solar3 MW5.8 mi north
Second Imperial GeothermalGeothermal74.5 MW6.1 mi south
Heber GeothermalGeothermal91.5 MW6.2 mi south
Heber SolarSolar10.9 MW6.2 mi south
Mesquite Lake Energy Park Plant 2Biomass and waste21 MW7.2 mi north
Spreckels Sugar CompanyNatural gas8.9 MW7.7 mi north