Dynegy Moss Landing Power Plant Hybrid

Natural gasCaliforniaFirst unit online 2002

Dynegy Moss Landing Power Plant Hybrid is a natural gas plant in Monterey County, California, operated by Dynegy -Moss Landing LLC. It ranks second by nameplate capacity among California’s 1,870 power plants. It is the biggest of California’s 303 natural gas plants. Retired units here add up to 1,704 MW across 3 units, taken out of service between 2016 and 2025. Of its current capacity, 350 MW came online between 2023 and 2025.

Nameplate capacity, 2025

1,848 MW

1,470 MW net summer capacity

8 operable units

  • Gas combined cycle1,398 MW76%
  • Battery450 MW24%

Unit by unit, 1967 to 2025

operating in 2025retiredbar height follows unit size

Unit 6 Gas steam turbine, 702 MW, 1967–2016
Unit 7 Gas steam turbine, 702 MW, 1968–2016
Unit CT1A Gas combined cycle, 233 MW, 2002
Unit CT1B Gas combined cycle, 233 MW, 2002
Unit CT2A Gas combined cycle, 233 MW, 2002
Unit CT2B Gas combined cycle, 233 MW, 2002
Unit ST1 Gas combined cycle, 233 MW, 2002
Unit ST2 Gas combined cycle, 233 MW, 2002
Unit BAT2 Battery, 100 MW, 2021
Unit BAT1 Battery, 300 MW, 2021–2025
Unit BAT3 Battery, 350 MW, 2023

Among California’s plants

Largest plants in the state by nameplate capacity, with the plants ranked next to this one.

  1. 1Diablo Canyon2,323 MW
  2. 2Dynegy Moss Landing Power Plant Hybridthis plant
  3. 3Haynes1,739 MW
  4. 4Castaic1,682 MW

All power plants in California

Other rankings

All US power plants
87th of 14,286
US natural gas plants
27th of 1,961
Plants in the California ISO balancing area
2nd of 1,637
Biggest single unit, among California’s plants
6th of 1,870

Operable units

UnitTechnologyNameplateSummerOnlineStatus
CT1AGas combined cycle233 MW165 MW2002Operating
CT1BGas combined cycle233 MW165 MW2002Operating
CT2AGas combined cycle233 MW165 MW2002Operating
CT2BGas combined cycle233 MW165 MW2002Operating
ST1Gas combined cycle233 MW180 MW2002Operating
ST2Gas combined cycle233 MW180 MW2002Operating
BAT2Battery100 MW100 MW2021Operating
BAT3Battery350 MW350 MW2023Operating

Retired units

UnitTechnologyNameplateIn service
6Gas steam turbine702 MW1967–2016
7Gas steam turbine702 MW1968–2016
BAT1Battery300 MW2021–2025

Grid and site

Balancing area
California ISO
Reliability region
Western Electricity Coordinating Council
Highest grid connection voltage
500 kV
Water source
Moss Landing Harbor
Nearest town on record
Moss Landing
Operator type
Independent producer
Coordinates
36.805°N, 121.782°W

Closest plants

PlantRuns onCapacityDistance
Elkhorn Battery Energy Storage SystemBattery storage182 MW0.2 mi north
Monterey Regional Water Pollution ControSolar1 MW5.8 mi south
Marina Landfill GasBiomass and waste5.1 MW6.4 mi south
Monterey One WaterBiomass and waste1.8 MW6.9 mi south
Ameresco Santa Cruz EnergyBiomass and waste3 MW8.0 mi north
Graniterock QuarrySolar4.4 MW11.1 mi northeast
TLR000 Hansen Fuel CellNatural gas3 MW13.5 mi southeast
Taylor Farms - Schilling PlaceNatural gas1 MW13.6 mi southeast