J C McNeil

Biomass and wasteVermontFirst unit online 1984

J C McNeil is a biomass and waste plant in Chittenden County, Vermont, operated by City of Burlington Electric (VT). It ranks second by nameplate capacity among Vermont’s 117 power plants. It is the biggest of Vermont’s 4 biomass and waste plants. Ownership is shared by three organizations; the largest stake, 50%, is held by City of Burlington Electric (VT).

Nameplate capacity, 2025

59.5 MW

52 MW net summer capacity

1 operable unit

  • Wood and wood waste59.5 MW100%

Unit by unit, 1984 to 2025

operating in 2025bar height follows unit size

Unit 1 Wood and wood waste, 59.5 MW, 1984

Among Vermont’s plants

Largest plants in the state by nameplate capacity, with the plants ranked next to this one.

  1. 1Kingdom Community Wind65 MW
  2. 2J C McNeilthis plant
  3. 3VPPSA Project 1047.2 MW
  4. 4Berlin 541.8 MW

All power plants in Vermont

Other rankings

All US power plants
3558th of 14,286
US biomass and waste plants
71st of 584
Plants in the ISO New England balancing area
86th of 1,475
Plants run by City of Burlington Electric (VT)
1st of 3
Biggest single unit, among Vermont’s plants
2nd of 117

Operable units

One unit can switch between natural gas and oil.

UnitTechnologyNameplateSummerOnlineStatus
1Wood and wood waste59.5 MW52 MW1984Operating

Who owns it

Shares are weighted by the nameplate capacity of each unit an owner holds.

OwnerShare of capacity
City of Burlington Electric (VT)50.0%
Green Mountain Power Corp31.0%
Vermont Public Power Supply Authority19.0%

Grid and site

Balancing area
ISO New England
Reliability region
Northeast Power Coordinating Council
Highest grid connection voltage
34.5 kV
Water source
Wells
Nearest town on record
Burlington
Operator type
Utility
Coordinates
44.492°N, 73.208°W

Closest plants

PlantRuns onCapacityDistance
Chace Mill Winooski OneHydroelectric7.5 MW1.0 mi east
Burlington GTOil and petroleum25.5 MW1.1 mi southwest
Colchester 16Oil and petroleum18 MW1.9 mi east
Gorge 18Hydroelectric3 MW1.9 mi east
158th Fighter Wing Solar FarmSolar1.3 MW2.9 mi east
Whitcomb Solar FarmSolar2.2 MW3.5 mi east
Essex Junction 19Hydroelectric16 MW4.6 mi east
Chittenden County Solar PartnersSolar2.2 MW4.9 mi southeast