P L Bartow

Natural gasFloridaFirst unit online 1972

P L Bartow is a natural gas plant in Pinellas County, Florida, operated by Duke Energy Florida, LLC. The operator has reported planned retirement dates for 222 MW of it, in 2034. Retired units here add up to 494 MW across 3 units, taken out of service in 2009. Within the Duke Energy Florida balancing area it is the third-largest of 74 plants. Seven units here can switch between natural gas and oil.

Nameplate capacity, 2025

1,476 MW

1,334 MW net summer capacity

9 operable units

  • Gas combined cycle1,254 MW85%
  • Gas combustion turbine111 MW7.5%
  • Oil-fired111 MW7.5%

Unit by unit, 1958 to 2025

operating in 2025retiredreported planned retirementbar height follows unit size

Unit ST1 Oil-fired, 128 MW, 1958–2009
Unit ST2 Oil-fired, 128 MW, 1961–2009
Unit ST3 Oil-fired, 239 MW, 1963–2009
Unit P1 Oil-fired, 55.4 MW, 1972
Unit P2 Gas combustion turbine, 55.4 MW, 1972
Unit P3 Oil-fired, 55.4 MW, 1972
Unit P4 Gas combustion turbine, 55.4 MW, 1972
Unit 4AGT Gas combined cycle, 208 MW, 2009
Unit 4BGT Gas combined cycle, 208 MW, 2009
Unit 4CGT Gas combined cycle, 208 MW, 2009
Unit 4DGT Gas combined cycle, 208 MW, 2009
Unit 4ST Gas combined cycle, 421 MW, 2009

Among Florida’s plants

Largest plants in the state by nameplate capacity, with the plants ranked next to this one.

  1. 1West County Energy Center4,263 MW
  2. 2Crystal River3,449 MW
  3. 3Turkey Point2,978 MW
  4. 13Big Bend1,797 MW
  5. 14Okeechobee Clean Energy Center1,723 MW
  6. 15P L Bartowthis plant
  7. 16Polk1,458 MW
  8. 17Dania Beach 71,448 MW

All power plants in Florida

Other rankings

All US power plants
143rd of 14,286
Power plants in Florida
15th of 331
US natural gas plants
50th of 1,961
Natural gas plants in Florida
13th of 68
Plants run by Duke Energy Florida, LLC
3rd of 43
Biggest single unit, among Florida’s plants
22nd of 331

Operable units

UnitTechnologyNameplateSummerOnlineStatus
P1Oil-fired55.4 MW41 MW1972Operating, retirement planned for 2034
P2Gas combustion turbine55.4 MW41 MW1972Operating, retirement planned for 2034
P3Oil-fired55.4 MW41 MW1972Operating, retirement planned for 2034
P4Gas combustion turbine55.4 MW45 MW1972Operating, retirement planned for 2034
4AGTGas combined cycle208 MW174 MW2009Operating
4BGTGas combined cycle208 MW187 MW2009Operating
4CGTGas combined cycle208 MW190 MW2009Operating
4DGTGas combined cycle208 MW193 MW2009Operating
4STGas combined cycle421 MW422 MW2009Operating

Retired units

UnitTechnologyNameplateIn service
ST1Oil-fired128 MW1958–2009
ST2Oil-fired128 MW1961–2009
ST3Oil-fired239 MW1963–2009

Grid and site

Balancing area
Duke Energy Florida
Reliability region
SERC Reliability Corporation
Highest grid connection voltage
230 kV
Water source
Tampa Bay
Nearest town on record
St. Petersburg
Operator type
Utility
Coordinates
27.860°N, 82.602°W

Closest plants

PlantRuns onCapacityDistance
Pinellas County Resource RecoveryBiomass and waste76.5 MW4.5 mi west
South Tampa Resilience ProjectNatural gas75.2 MW5.2 mi east
John Hopkins Middle School MicrogridBattery storage3.3 MW7.1 mi southwest
BayboroOil and petroleum170 MW7.3 mi south
TIA SolarSolar1.6 MW8.5 mi northeast
Howard F Curren Advncd Wastewater PlantBiomass and waste2.5 MW11.4 mi northeast
H L Culbreath Bayside Power StationNatural gas2,294 MW11.4 mi east
IKEA Tampa 042Solar1 MW12.2 mi northeast