GridPlants

Newman

Natural gasTexasFirst unit online 1960

Newman is a natural gas plant in El Paso County, Texas, operated by El Paso Electric Co. Within the El Paso Electric balancing area it is the largest of 27 plants. The operator has reported planned retirement dates for 575 MW of it, between 2027 and 2031. Of its current capacity, 228 MW came online between 2023 and 2025. Three units here can switch between natural gas and oil.

Nameplate capacity, 2025

1,110 MW

906 MW net summer capacity

10 operable units

  • Gas combined cycle597 MW54%
  • Gas steam turbine285 MW26%
  • Gas combustion turbine228 MW21%

Unit by unit, 1960 to 2025

operating in 2025reported planned retirementbar height follows unit size

Unit 1 Gas steam turbine, 81.6 MW, 1960
Unit 2 Gas steam turbine, 81.6 MW, 1963
Unit 3 Gas steam turbine, 122 MW, 1966
Unit 4 Gas combined cycle, 120 MW, 1975
Unit CT1 Gas combined cycle, 85 MW, 1975
Unit CT2 Gas combined cycle, 85 MW, 1975
Unit 5CT1 Gas combined cycle, 86.5 MW, 2009
Unit 5CT2 Gas combined cycle, 86.5 MW, 2009
Unit 5CA1 Gas combined cycle, 134 MW, 2011
Unit 6 Gas combustion turbine, 228 MW, 2023

Among Texas’s plants

Largest plants in the state by nameplate capacity, with the plants ranked next to this one.

  1. 1W A Parish4,008 MW
  2. 2South Texas Project2,709 MW
  3. 3Comanche Peak2,430 MW
  4. 24Welsh1,116 MW
  5. 25Lamar Power Project1,113 MW
  6. 26Newmanthis plant
  7. 27Rio Nogales Power Project1,108 MW
  8. 28Guadalupe Generating Station1,088 MW

All power plants in Texas

Other rankings

All US power plants
265th of 14,286
Power plants in Texas
26th of 1,023
US natural gas plants
125th of 1,961
Natural gas plants in Texas
16th of 305
Plants run by El Paso Electric Co
1st of 9
Biggest single unit, among Texas’s plants
178th of 1,023

Operable units

UnitTechnologyNameplateSummerOnlineStatus
1Gas steam turbine81.6 MW61 MW1960Operating, retirement planned for 2027
2Gas steam turbine81.6 MW65 MW1963Operating, retirement planned for 2028
3Gas steam turbine122 MW88 MW1966Operating, retirement planned for 2031
4Gas combined cycle120 MW86 MW1975Operating, retirement planned for 2031
CT1Gas combined cycle85 MW64 MW1975Operating, retirement planned for 2031
CT2Gas combined cycle85 MW67 MW1975Operating, retirement planned for 2031
5CT1Gas combined cycle86.5 MW66 MW2009Operating
5CT2Gas combined cycle86.5 MW66 MW2009Operating
5CA1Gas combined cycle134 MW115 MW2011Operating
6Gas combustion turbine228 MW228 MW2023Operating

Grid and site

Balancing area
El Paso Electric
Reliability region
Western Electricity Coordinating Council
Highest grid connection voltage
115 kV
Water source
Treated Municipal Waste
Nearest town on record
El Paso
Operator type
Utility
Coordinates
31.984°N, 106.432°W

Closest plants

PlantRuns onCapacityDistance
Newman SolarSolar10.5 MW0.4 mi southeast
SunE EPE1 LLCSolar10 MW6.4 mi northeast
Buena Vista Energy CenterSolar170 MW10.3 mi northeast
Fort Bliss (DEA EPIC)Solar2 MW11.2 mi south
New Mexico State UniversityNatural gas4.7 MW12.6 mi north
TJX 2021 DG El Paso DCSolar1.5 MW13.3 mi southeast
Rio GrandeNatural gas348 MW14.1 mi southwest
Phelps Dodge RefiningNatural gas19.6 MW15.3 mi south